LIFTING & MOVING

PLANT MODULE TRANSPORTATION

PHOTO DETAILS

REPRESENTATIVE

CLIENT GS E&C / PERTAMINA
BUSINESS NAME RFCC SEMI MODULE SEA TRANSPORT
CONSTRUCTION SCALE 012/10 ~ 2014/01
CONSTRUCTION PERIOD 012/10 ~ 2014/01
BUSINESS INFORMATION

 1) RX & RG STRUCTURE SEMI MODULE HANDLING ENGINEERING

 2) ASSEMBLY AREA LAY OUT ENGINEERING

 3) SEA TRANSPORTATION ENGINEERING

 4) LIFTING & ERECTION ENGINEERING

 5) 3D CLASH CHECK

SUB PERFORMANCE

NO. CLIENT BUSINESS NAME CONSTRUCTION PERIOD BUSINESS INFORMATION PHOTO DETAILS
1 GS E&C NO.3 HOU PROJECT MODULE SEA TRANSPORT 2008/07 ~ 2008/09

1) MODULE STRUCTURE ANALYSIS

2) LOADING BEAM DESIGN FOR MODULE TRANSPORTATION

3) DESIGN FOR SHIPPING BY SEA

4) TECHNICAL SUPPORT SERVICE

2 GLOBAL / SEJIN HEAVY INDUSTRIES / HYUNDAI HEAVY INDUSTRIES FLARE TOWER SEA SHIPPING 2013/03 ~ 2014/10

1) FLARE TOWER BLOCK INLAND TRANSFER ENGINEERING

2) FLARE TOWER SEA TRANSPORTATION ENGINEERING

3) LOAD OUT & SEA FASTENING

3 DAEWOO LOGISTICS PARADIP REFINERY PROJECT PRESSURE VESSEL SEA TRANSPORT 2011/01 ~ 2011/09

1) SEA TRANSPORTATION
   ENGINEERING

4 HYUNDAI HEAVY INDUSTRIES / TOTAL LCP BADAMYAR PROJECT MODULE LOADOUT 2015/11 ~ 2016/01 (JACKET & TOPSIDE)
2016/09 ~ 2016/11
(LCP MODULE & BRIDGE)

1) LOADOUT BALLASTING
   CALCULATION

2) LOADOUT ENGINEERING

3) LOADOUT OPERATING

5 DAEWOO SHIPBUILDING & MARINE ENGINEERING CHAYVO PROJECT MODULE LOADOUT 2012/05 ~ 2012/07

1) BALLASTING CALCULATION AND REPORT CREATION

2) LOADOUT BALLASTING USING SUBMERSIBLE PUMP

6 KEPPEL KAZAKHSTAN CANTILEVER WITH DERRICK BLOCK LOADOUT 2014/05 ~ 2014/06

1) SIDE LOADOUT ENGINEERING

2) LOADOUT METHOD STATEMENT
   작성

3) SEA FASTENING ENGINEERING 

4) LOADOUT SUPERVISION

7 EXXON MOBILE / HYUNDAI HEAVY INDUSTRIES POINT THOMSON PROJECT MODULE LOADOUT 2015/04 ~ 2015/07

1) LOADOUT BALLASTING
   CALCULATION

2) LOADOUT ENGINEERING

3) LOADOUT OPERATING

8 GLOBAL / SAMSUNG HEAVY INDUSTRIES / STATOIL STAIR TOWER SEA TRANSPORT 2017/11 ~ 2018/04

1) STAIR TOWER (ALUMINUM) SEA TRANSPORT ENGINEERING

9 DOOSAN HEAVY INDUSTRIES & CONSTRUCTION FUJAIRAH HRSG PROJECT MODULE / DUCT SEA TRANSPORT 2001/10 ~ 2002/01

1) MODULE & DUCT STRUCTURE ANALYSIS

2) SEA FASTENING DESIGN

3) REVIEW OF SHIPPING VESSELS

4) SUPERVISION