DESIGN & ANALYSIS

BWTS

PHOTO DETAILS

PERFORMANCE

CLIENT SAMWOO T.E.S
BUSINESS NAME PAN EDELWEISS - BWTS RETROFIT
CONSTRUCTION SCALE 2019/08 – 2019/09
CONSTRUCTION PERIOD 2019/08 – 2019/09
BUSINESS INFORMATION

1) 3D SCAN, 3D MODELING WORK

2) OVERALL LENGTH AND PIPING DESIGN

3) CREATION OF INSTALLATION DRAWINGS AND PRODUCTION DRAWINGS

SUB PERFORMANCE

NO. CLIENT BUSINESS NAME CONSTRUCTION PERIOD BUSINESS INFORMATION PHOTO DETAILS
1 SAMWOO T.E.S PAN MUTIARA - BWTS RETROFIT 2019/10 ~ 2019/11

1) 3D SCAN, 3D MODELING WORK

2) OVERALL LENGTH AND PIPING DESIGN

3) CREATION OF INSTALLATION DRAWINGS AND PRODUCTION DRAWINGS

2 SAMWOO T.E.S PAN GLORIA ~ BWTS RETROFIT 2019/10 ~ 2019/11

1) 3D SCAN, 3D MODELING WORK

2) OVERALL LENGTH AND PIPING DESIGN

3) CREATION OF INSTALLATION DRAWINGS AND PRODUCTION DRAWINGS