CLIENT | DAEWOO E&C / KOREA SCAFFOLDING |
BUSINESS NAME | INDIA MUMBAI OFFSHORE SECTION 2 BRIDGE CONSTRUCTION |
CONSTRUCTION SCALE | 54 MONTHS AFTER THE START OF CONSTRUCTION |
CONSTRUCTION PERIOD | 54 MONTHS AFTER THE START OF CONSTRUCTION |
BUSINESS INFORMATION |
1) REVIEW OF SUPPLEMENTATION AND REVISION OF BASIC CONSTRUCTION METHOD 2) REVIEW OF DESIGN CONDITIONS, WORKING CONDITIONS, AND ENVIRONMENTAL CONDITIONS 3) REVIEW OF EQUIPMENT SELECTION FOR TRANSPORTATION AND CONSTRUCTION 4) SPMT TRANSPORTATION PLAN 5) LOADING RAMP-WAY DESIGN 6) BARGE MOORING/BALLAST PLAN 7) BARGE STRENGTH CHECK 8) BARGE DECK GRILLAGE DESIGN 9) SEA-TRANSPORTATION MOTION ANALYSIS 10) SEA-FASTENING DESIGN 11) BARGE STABILITY CHECK 12) BARGE TOWING PLAN 13) BARGE MOORING PLAN FOR BLOCK INSTALLATION 14) GIRDER BLOCK LIFTING PLAN (MEGA JACK SYSTEM) 15) GIRDER STRENGTH & DEFLECTION CHECK 16) GIRDER LOCAL STRENGTH CHECK 17) LOCAL REINFORCEMENT DESIGN 18) BARGE BALLAST PLAN FOR BLOCK LIFTING 19) BARGE DYNAMIC ANALYSIS BY MOSES 20) TECHNICAL SUPPORT FOR OVERSEAS DISPATCH OF HIGH-LEVEL PERSONNEL AND BUSINESS RESPONSE |
NO. | CLIENT | BUSINESS NAME | CONSTRUCTION PERIOD | BUSINESS INFORMATION | PHOTO DETAILS |
1 | SAMHWAN ENTERPRISES / SUNGCHANG INDUSTRIAL | GWANGAN BRIDGE SECTION 2 SUSPENSION BRIDGE TEMPORARY CONSTRUCTION TRUSS MARINE TRANSPORTATION | 2001/07 ~ 2002/04 | 1) REVIEW OF TRANSPORT EQUIPMENT 2) SEA FASTENING DESIGN 3) LOADING AND UNLOADING DESIGN 4) REVIEW OF THE GROUND ASSEMBLY METHOD |
|
2 | HYUNDAI E&C | KUWAIT BRIDGE CONSTRUCTION PYLON FOUNDATION LIFTING ENGINEERING | 2014/08 ~ 2015/02 | 1) PYLON PC HOUSE SALVAGE, TRANSPORTATION AND INSTALLATION TECHNOLOGY SERVICE 2) PC HOUSE TRANSPORT BARGE REINFORCEMENT DESIGN 3) 60M PC BOX GIRDER TRANSPORT BARGE REINFORCEMENT DESIGN 4) FLOATING CRANE TOWING STABILITY CHECK |
|
3 | HYUNDAI E&C | GOHA BAMBOO BRIDGE YEONGYO ISLAND CAISSON INSTALLATION CONSTRUCTION | 2006/12 ~ 2007/01 | 1) CAISSON SEA TRANSPORTATION ENGINEERING 2) STOWAGE PLAN & SEA FASTENING 3) LIFTING BEAM DESIGN 4) STRUCTURAL STRENGTH REVIEW 5) MOORING PLAN & WORKING PROCEDURE |
|
4 | HYUNDAI E&C / HANGJIN DEVELOPMENT / CHANGWU MARINE | MACHANG BRIDGE TEMPORARY CONSTRUCTION WELL BARREL LIFTING AND INSTALLATION ENGINEERING | 2005/04 ~ 2005/05 | 1) REVIEW OF PC HOUSE SALVAGE PLAN 2) REVIEW OF LIFTING EQUIPMENT SPECIFICATIONS 3) DESIGN OF LUGS FOR LIFTING |
|
5 | DAELIM CONSTRUCTION | ABHAE BRIDGE CAISSON SALVAGE AND INSTALLATION WORK | 2001/10 ~ 2001/12 | 1) SALVAGE TOOL STRUCTURAL ANALYSIS 2) REVIEW OF LIFTING STABILITY |
|
6 | HYUNDAI E&C / SAMJIN INDUSTRIAL | NEW INDUSTRIAL RAILWAY TEMPORARY CONSTRUCTION IN THE SOUTHWEST REGION BRIDGE BOX CONSTRUCTION ENGINEERING | 2001/06 ~ 2001/10 | 1) SELECTION OF TEMPORARY EQUIPMENT 2) REVIEW THE HYPOTHESIS METHOD 3) TEMPORARY STRUCTURE DESIGN 4) PREPARATION OF CONSTRUCTION SPECIFICATIONS |
|