CLIENT | KTT PLANT |
BUSINESS NAME | MIXED FEED CRACKER PROJECT BALL TANK TRANSPORT ENGINEERING |
CONSTRUCTION SCALE | 2019/03 ~ 2019/04 |
CONSTRUCTION PERIOD | 2019/03 ~ 2019/04 |
BUSINESS INFORMATION |
1) TRANSPORT CONCEPT DESIGN 2) CONDUCTION REVIEW DURING TRANSPORTATION 3) FINITE ELEMENT MODELING AND STRUCTURAL ANALYSIS 4) REACTION CHECK 5) TECHNICIAN APPROVAL 6) STRUCTURAL ANALYSIS REPORT PREPARATION |
NO. | CLIENT | BUSINESS NAME | CONSTRUCTION PERIOD | BUSINESS INFORMATION | PHOTO DETAILS |
1 | SHINHEUNG INDUSTRY | STORAGE TANK T-001 MINIMUM THICKNESS REVIEW | 2020/06 | 1) CALCULATION OF MINIMUM THICKNESS OF PRESSURE VESSEL AND DRAWING OF CONCEPT |
|
2 | DAEWOO LOGISTICS | PARADIP REFINERY PROJECT PRESSURE VESSEL SEA TRANSPORT | 2011/01 ~ 2011/09 | 1) SEA TRANSPORTATION ENGINEERING |
|