CLIENT | DAEWOO LOGISTICS / SUNGJIN GEOTECH |
BUSINESS NAME | EVAPORATOR 2 SET SEA TRANSPORT |
CONSTRUCTION SCALE | 2011/11 ~ 2012/02 |
CONSTRUCTION PERIOD | 2011/11 ~ 2012/02 |
BUSINESS INFORMATION |
1) REVIEW OF DESALINATION EQUIPMENT LOADING AND UNLOADING PLAN 2) SEA TRANSPORT STABILITY REVIEW 3) SEA FASTENING TECHNOLOGY REVIEW AND PLAN PREPARATION 4) SEA FASTENING STRUCTURE DESIGN 5) SHIPPING SUPERVISION |
NO. | CLIENT | BUSINESS NAME | CONSTRUCTION PERIOD | BUSINESS INFORMATION | PHOTO DETAILS |
1 | GLOBAL / SEJIN HEAVY INDUSTRIES / HYUNDAI HEAVY INDUSTRIES | FLARE TOWER SEA SHIPPING | 2013/03 ~ 2014/10 | 1) FLARE TOWER BLOCK INLAND TRANSFER ENGINEERING 2) FLARE TOWER SEA TRANSPORTATION ENGINEERING 3) LOAD OUT & SEA FASTENING |
|
2 | GS E&C | NO.3 HOU PROJECT MODULE SEA TRANSPORT | 2008/07 ~ 2008/09 | 1) MODULE STRUCTURE ANALYSIS 2) LOADING BEAM DESIGN FOR MODULE TRANSPORTATION 3) DESIGN FOR SHIPPING BY SEA 4) TECHNICAL SUPPORT SERVICE |
|
3 | DOOSAN HEAVY INDUSTRIES & CONSTRUCTION / DONGBANG | POSCO CSU MARINE TRANSPORTATION | 2003/08 ~ 2004/05 | 1) REVIEW OF CSU LOADING AND UNLOADING PLAN 2) SEA TRANSPORT STABILITY REVIEW 3) SEA FASTENING TECHNOLOGY REVIEW AND PLAN PREPARATION 4) SEA FASTENING STRUCTURE DESIGN 5) LOADING AND UNLOADING SUPERVISION |
|
4 | GS E&C / PERTAMINA | RFCC SEMI MODULE SEA TRANSPORT | 2012/10 ~ 2014/01 | 1) RX & RG STRUCTURE SEMI MODULE HANDLING 2) ASSEMBLY AREA LAY OUT ENGINEERING 3) SEA TRANSPORTATION ENGINEERING 4) LIFTING & ERECTION ENGINEERING 5) 3D CLASH CHECK |
|
5 | DAEWOO LOGISTICS | PARADIP REFINERY PROJECT PRESSURE VESSEL SEA TRANSPORT | 2011/01 ~ 2011/09 | 1) SEA TRANSPORTATION ENGINEERING |
|
6 | HYUNDAI E&C | LAUNCHING GANTRY OCEAN SHIPPING | 2018/04 | 1) LIFTING ENGINEERING 2) SEA TRANSPORTATION ENGINEERING |
|
7 | SAMHWAN ENTERPRISE / SUNGCHANG INDUSTRIAL | GWANGAN BRIDGE SECTION 2 SUSPENSION BRIDGE TEMPORARY CONSTRUCTION TRUSS MARITIME TRANSPORTATION | 2001/07 ~ 2002/04 | 1) REVIEW OF TRANSPORT EQUIPMENT 2) SEA FASTENING DESIGN 3) LOADING AND UNLOADING DESIGN 4) REVIEW OF THE GROUND ASSEMBLY METHOD |
|
8 | HUTA / ASAN INTERNATIONAL | 1200TON CLASS FLOATING CRANE SEA TRANSPORT | 2011/03 ~ 2011/06 | 1) BOOM STRUCTURAL STRENGTH ANALYSIS AND REPORT PREPARATION ACCORDING TO THE SELF-PROPELLED SHIP’S MOTION 2) DRAWING OF BOOM SEA FASTENING ACCORDING TO ANALYSIS RESULT 3) DRAWING AND REPORT OF SEA FASTENING OF GENERAL EQUIPMENT |
|
9 | GLOBAL / SAMSUNG HEAVY INDUSTRIES / STATOIL | STAIR TOWER SEA TRANSPORT | 2017/11 ~ 2018/04 | 1) STAIR TOWER (ALUMINUM) SEA TRANSPORT ENGINEERING |
|
10 | SAMSUNG HEAVY INDUSTRIES | ICHTHYS BLOCK SEA TRANSPORT | 2014/01 ~ 2014/09 | 1) ICHTHYS BLOCK LIFTING ENGINEERING 2) SEA TRANSPORTATION ENGINEERING |
|
11 | DAEWOO E&C / SUNGCHANG INDUSTRIAL | SEOSAN ARRIVAL AND SHIPMENT PIER CONSTRUCTION JACKET MARINE TRANSPORTATION | 2004/05 ~ 2005/12 | 1) JACKET SHOP DRAWING 2) CUTTING PLAN 3) SEA FASTENING ENGINEERING 4) STRUCTURE ANALYSIS |
|
12 | DAEWOO E&C / SUNGCHANG INDUSTRIAL | GWANGYANG LNG TERMINAL JACKET MARINE TRANSPORTATION | 2003/06 ~ 2004/09 | 1) SHIPMENT METHOD AND SHIPPING EQUIPMENT LAYOUT PLAN 2) STOWAGE PLAN & STABILITY REVIEW 3) SEA FASTENING DESIGN 4) STRUCTURAL CALCULATION AND STABILITY REVIEW |
|
13 | DOOSAN HEAVY INDUSTRIES & CONSTRUCTION | FUJAIRAH HRSG PROJECT MODULE / DUCT SEA TRANSPORT | 2001/10 ~ 2002/01 | 1) MODULE & DUCT STRUCTURE ANALYSIS 2) SEA FASTENING DESIGN 3) REVIEW OF SHIPPING VESSELS 4) SUPERVISION |
|