CLIENT | HYUNDAI HEAVY INDUSTRIES / TOTAL |
BUSINESS NAME | LCP BADAMYAR PROJECT MODULE LOADOUT |
CONSTRUCTION SCALE | 2015/11 ~ 2016/01 (JACKET & TOPSIDE) 2016/09 ~ 2016/11 (LCP MODULE & BRIDGE) |
CONSTRUCTION PERIOD | 2015/11 ~ 2016/01 (JACKET & TOPSIDE) 2016/09 ~ 2016/11 (LCP MODULE & BRIDGE) |
BUSINESS INFORMATION |
1) LOADOUT BALLASTING CALCULATION 2) LOADOUT ENGINEERING 3) LOADOUT OPERATING
|
NO. | CLIENT | BUSINESS NAME | CONSTRUCTION PERIOD | BUSINESS INFORMATION | PHOTO DETAILS |
1 | DAEWOO SHIPBUILDING & MARINE ENGINEERING | CHAYVO PROJECT MODULE LOADOUT | 2012/05 ~ 2012/07 | 1) BALLASTING CALCULATION AND REPORT CREATION 2) LOADOUT BALLASTING USING SUBMERSIBLE PUMP |
|
2 | KEPPEL KAZAKHSTAN | CANTILEVER WITH DERRICK BLOCK LOADOUT | 2014/05 ~ 2014/06 | 1) SIDE LOADOUT ENGINEERING 2) LOADOUT METHOD STATEMENT 작성 3) SEA FASTENING ENGINEERING 4) LOADOUT SUPERVISION |
|
3 | PLUS INTERNATIONAL | ICHTHYS PROJECT BLOCK LOADOUT | 2014/05 | 1) SKIDDING BRIDGE STRENGTH CHECK 2) SPREADING MAT STRENGTH CHECK 3) DECK STRENGTH CHECK |
|
4 | EXXON MOBIL / HYUNDAI HEAVY INDUSTRIES | POINT THOMSON PROJECT MODULE LOADOUT | 2015/04 ~ 2015/07 | 1) LOADOUT BALLASTING CALCULATION 2) LOADOUT ENGINEERING 3) LOADOUT OPERATING |
|
5 | ONGC / LTHE | JACKET SKID LOADOUT | 2016/12 | 1) JACKET SKID LOADOUT ENGINEERING |
|
6 | TOTAL / HYUNDAI HEAVY INDUSTRIES | Z2020 LIBRA TURRET LOADOUT | 2016/03 ~ 2016/07 | 1) FPSO TURRET LOADOUT ENGINEERING |
|
7 | TRIYARDS | FPSO TURRET LOADOUT | 2016/03 ~ 2016/07 | 1) FPSO TURRET LOADOUT ENGINEERING |
|