CLIENT HYUNDAI HEAVY INDUSTRIES / TOTAL
BUSINESS NAME LCP BADAMYAR PROJECT MODULE LOADOUT
CONSTRUCTION SCALE 2015/11 ~ 2016/01 (JACKET & TOPSIDE) 2016/09 ~ 2016/11 (LCP MODULE & BRIDGE)
CONSTRUCTION PERIOD 2015/11 ~ 2016/01 (JACKET & TOPSIDE) 2016/09 ~ 2016/11 (LCP MODULE & BRIDGE)
BUSINESS INFORMATION

1) LOADOUT BALLASTING CALCULATION

2) LOADOUT ENGINEERING

3) LOADOUT OPERATING

    

SUB PERFORMANCE

NO. CLIENT BUSINESS NAME CONSTRUCTION PERIOD BUSINESS INFORMATION PHOTO DETAILS
1 DAEWOO SHIPBUILDING & MARINE ENGINEERING CHAYVO PROJECT MODULE LOADOUT 2012/05 ~ 2012/07

1) BALLASTING CALCULATION AND REPORT CREATION

2) LOADOUT BALLASTING USING SUBMERSIBLE PUMP

2 KEPPEL KAZAKHSTAN CANTILEVER WITH DERRICK BLOCK LOADOUT 2014/05 ~ 2014/06

1) SIDE LOADOUT ENGINEERING

2) LOADOUT METHOD STATEMENT 작성

3) SEA FASTENING ENGINEERING 

4) LOADOUT SUPERVISION

3 PLUS INTERNATIONAL ICHTHYS PROJECT BLOCK LOADOUT 2014/05

1) SKIDDING BRIDGE STRENGTH CHECK

2) SPREADING MAT STRENGTH CHECK

3) DECK STRENGTH CHECK

4 EXXON MOBIL / HYUNDAI HEAVY INDUSTRIES POINT THOMSON PROJECT MODULE LOADOUT 2015/04 ~ 2015/07

1) LOADOUT BALLASTING CALCULATION

2) LOADOUT ENGINEERING

3) LOADOUT OPERATING

5 ONGC / LTHE JACKET SKID LOADOUT 2016/12

1) JACKET SKID LOADOUT ENGINEERING

6 TOTAL / HYUNDAI HEAVY INDUSTRIES Z2020 LIBRA TURRET LOADOUT 2016/03 ~ 2016/07

1) FPSO TURRET LOADOUT ENGINEERING

7 TRIYARDS FPSO TURRET LOADOUT 2016/03 ~ 2016/07

1) FPSO TURRET LOADOUT ENGINEERING