CLIENT | MASTECH HEAVY INDUSTRIES |
BUSINESS NAME | DEVELOPED FLOATING OFFSHORE WIND POWER GENERATION PILOT PLANT (750KW CLASS) FOR MEDIUM DEPTH |
CONSTRUCTION SCALE | 2016/05 ~ 2020/04 |
CONSTRUCTION PERIOD | 2016/05 ~ 2020/04 |
BUSINESS INFORMATION |
1) FLOATING WIND POWER PLANT SUBSTRUCTURE STRUCTURAL STRENGTH REVIEW (WIND TOWER CONNECTION, MOORING CONNECTION) 2) CALCULATION OF ENVIRONMENTAL LOAD FOR FLOATING WIND POWER PLANT AND SELECTION OF MOORING LINE |
NO. | CLIENT | BUSINESS NAME | CONSTRUCTION PERIOD | BUSINESS INFORMATION | PHOTO DETAILS |
1 | GS E&C / GWANSU E&C | 2ND NAMHAE BRIDGE BRIDGE SALVAGE AND MOORING CALCULATION | 2017/03 ~ 2017/09 | 1) L/C 1200TON FLOATING CRANE ANCHORING LINE CALCULATION 2) WRITE REPORT |
|
2 | DAELIM / C&SC | NEW MILLENNIUM BRIDGE SALVAGE AND MOORING CALCULATIONS | 2017/08 ~ 2017/10 | 1) L/C 1500TON FLOATING CRANE ANCHORING LINE CALCULATION 2) WRITE REPORT |
|
3 | KOREA ELECTRIC POWER CORPORATION / HYUNDAI STEEL INDUSTRY CO., LTD. | SEONAMHAE OFFSHORE WIND POWER DEMONSTRATION COMPLEX OFFSHORE SUBSTATION CONSTRUCTION WORK | 2016/12 ~ 2018/04 | 1) OFFSHORE SUBSTATION UPPER/LOWER STRUCTURE LOADING MOORING CALCULATION 2) CALCULATION OF SALVAGE MOORING OF OFFSHORE SUBSTATION UPPER/LOWER STRUCTURES |
|
4 | HYUNDAI MIPO DOCKYARD / GLOBAL | CRAWLER CRANE SEA TRANSPORT | 2017/11 ~ 2018/03 | 1) CRAWLER CRANE LOADING/UNLOADING MOORING CALCULATION |
|
5 | HYUNDAI MIPO DOCKYARD / GLOBAL | MUMBAI BRIDGE BLOCK SHIPPING, TRANSPORTATION, INSTALLATION ENGINEERING | 2019/10 ~ | 1) 100M BARGE / H-SHAPE BARGE BRIDGE BLOCK LOADING, TRANSPORTATION, AND MOORING CALCULATIONS FOR INSTALLATION |
|
6 | MASTECH HEAVY INDUSTRIES / GHI YACHTS | FLOATING CRANE ANCHORING FORCE CALCULATION | 2012/02 | 1) L/C 2000TON FLOATING CRANE POSITIONING ANCHORING LOAD ANALYSIS 2) WRITE ANALYSIS REPORT |
|