LIFTING & MOVING

SALVAGE & INSTALLATION ENGINEERING

PHOTO DETAILS

REPRESENTATIVE

CLIENT POSCO PLANTEC
BUSINESS NAME CSU DISMANTLING & INSTALLATION ENGINEERING
CONSTRUCTION SCALE 2012/07 ~ 2012/08
CONSTRUCTION PERIOD 2012/07 ~ 2012/08
BUSINESS INFORMATION

 1) CSU (CONTINUOUS SHIP UNLOADER) FULL DISMANTLING ENGINEERING

 2) CSU FULL TRANSPORT ENGINEERING

 3) CSU FULL INSTALLATION ENGINEERING

SUB PERFORMANCE

NO. CLIENT BUSINESS NAME CONSTRUCTION PERIOD BUSINESS INFORMATION PHOTO DETAILS
1 POSCO PLANTEC GTSU DISMANTLING & INSTALLATION ENGINEERING 2016/07 ~ 2016/12

1) DEMOLITION OF OLD BOOM

2) INSTALL NEW BOOM

3) SEA FASTENING ENGINEERING

4) SEA TRANSPORTATION ENGINEERING

2 S-OIL / HAESUNG DEVELOPMENT INTAKE ASYMMETRY CONCRETE BLOCK LIFTING & INSTALLATION ENGINEERING 2015/03

1) INTAKE ASYMMETRY CONCRETE BLOCK (OUTFALL) LIFTING BY LAND CRANE

2) INSTALLATION ON THE SEABED

3 PAN STAR / SEJIN HEAVY INDUSTRIES / SAMSUNG HEAVY INDUSTRIES DECK HOUSE SALVAGE ENGINEERING 2017/06 ~ 2017/12

1) LIFTING ENGINEERING FOR DECK HOUSE LIFTING LOADOUT

2) FULL MODELING & ANALYSIS

4 HANWHA CHEMICAL CSU SALVAGE ENGINEERING 2018/09

1) CSU (CONTINUOUS SHIP UNLOADER) FULL SALVAGE ENGINEERING

5 HYUNDAI E&C KUWAIT BRIDGE CONSTRUCTION PYLON FOUNDATION LIFTING ENGINEERING 2014/08 ~ 2015/02

1) PYLON PC HOUSE SALVAGE, TRANSPORTATION AND INSTALLATION TECHNOLOGY SERVICE

2) PC HOUSE TRANSPORTATION BARGE REINFORCEMENT DESIGN

3) 60M PC BOX GIRDER TRANSPORT BARGE REINFORCEMENT DESIGN

4) FLOATING CRANE TOWING STABILITY CHECK

6 DAELIM CONSTRUCTION LAUNCHING GANTRY SALVAGE ENGINEERING 2018/08

1) LIFTING ENGINEERING

2) SEA TRANSPORTATION ENGINEERING

3) MOORING CLACULATION

7 KUMYONG DEVELOPMENT SAMCHEONPO NEW PORT CONSTRUCTION CONCRETE CAISSON SALVAGE PORT DESIGN 2009/11

1) CREATE LIFTING PLAN

2) CONCRETE CAISSON SALVAGE BIT DESIGN

3) STRUCTURAL ANALYSIS

4) DESIGN APPROVAL WORK

8 GS E&C / PERTAMINA RFCC SEMI MODULE MARINE TRANSPORT, LIFTING AND INSTALLATION ENGINEERING 2012/10 ~ 2014/01

1) RX & RG STRUCTURE SEMI MODULE HANDLING
   ENGINEERING

2) ASSEMBLY AREA LAY OUT ENGINEERING

3) SEA TRANSPORTATION ENGINEERING

4) LIFTING & ERECTION ENGINEERING

5) 3D CLASH CHECK

9 HYUNDAI E&C / HANGJIN DEVELOPMENT / CHANGWU MARINE MACHANG BRIDGE TEMPORARY CONSTRUCTION WELL BARREL LIFTING AND INSTALLATION ENGINEERING 2005/04 ~ 2005/05

1) REVIEW OF PC HOUSE SALVAGE PLAN

2) REVIEW OF LIFTING EQUIPMENT SPECIFICATIONS

3) DESIGN OF LUGS FOR LIFTING

10 DAELIM CONSTRUCTION ABHAE BRIDGE CAISSON SALVAGE AND INSTALLATION WORK 2001/10 ~ 2001/12

1) STRUCTURAL ANALYSIS OF SMALL SPHERES FOR LIFTING

2) REVIEW OF LIFTING STABILITY