CLIENT | POSCO PLANTEC |
BUSINESS NAME | CSU DISMANTLING & INSTALLATION ENGINEERING |
CONSTRUCTION SCALE | 2012/07 ~ 2012/08 |
CONSTRUCTION PERIOD | 2012/07 ~ 2012/08 |
BUSINESS INFORMATION |
1) CSU (CONTINUOUS SHIP UNLOADER) FULL DISMANTLING ENGINEERING 2) CSU FULL TRANSPORT ENGINEERING 3) CSU FULL INSTALLATION ENGINEERING |
NO. | CLIENT | BUSINESS NAME | CONSTRUCTION PERIOD | BUSINESS INFORMATION | PHOTO DETAILS |
1 | POSCO PLANTEC | GTSU DISMANTLING & INSTALLATION ENGINEERING | 2016/07 ~ 2016/12 | 1) DEMOLITION OF OLD BOOM 2) INSTALL NEW BOOM 3) SEA FASTENING ENGINEERING 4) SEA TRANSPORTATION ENGINEERING |
|
2 | S-OIL / HAESUNG DEVELOPMENT | INTAKE ASYMMETRY CONCRETE BLOCK LIFTING & INSTALLATION ENGINEERING | 2015/03 | 1) INTAKE ASYMMETRY CONCRETE BLOCK (OUTFALL) LIFTING BY LAND CRANE 2) INSTALLATION ON THE SEABED |
|
3 | PAN STAR / SEJIN HEAVY INDUSTRIES / SAMSUNG HEAVY INDUSTRIES | DECK HOUSE SALVAGE ENGINEERING | 2017/06 ~ 2017/12 | 1) LIFTING ENGINEERING FOR DECK HOUSE LIFTING LOADOUT 2) FULL MODELING & ANALYSIS |
|
4 | HANWHA CHEMICAL | CSU SALVAGE ENGINEERING | 2018/09 | 1) CSU (CONTINUOUS SHIP UNLOADER) FULL SALVAGE ENGINEERING |
|
5 | HYUNDAI E&C | KUWAIT BRIDGE CONSTRUCTION PYLON FOUNDATION LIFTING ENGINEERING | 2014/08 ~ 2015/02 | 1) PYLON PC HOUSE SALVAGE, TRANSPORTATION AND INSTALLATION TECHNOLOGY SERVICE 2) PC HOUSE TRANSPORTATION BARGE REINFORCEMENT DESIGN 3) 60M PC BOX GIRDER TRANSPORT BARGE REINFORCEMENT DESIGN 4) FLOATING CRANE TOWING STABILITY CHECK |
|
6 | DAELIM CONSTRUCTION | LAUNCHING GANTRY SALVAGE ENGINEERING | 2018/08 | 1) LIFTING ENGINEERING 2) SEA TRANSPORTATION ENGINEERING 3) MOORING CLACULATION |
|
7 | KUMYONG DEVELOPMENT | SAMCHEONPO NEW PORT CONSTRUCTION CONCRETE CAISSON SALVAGE PORT DESIGN | 2009/11 | 1) CREATE LIFTING PLAN 2) CONCRETE CAISSON SALVAGE BIT DESIGN 3) STRUCTURAL ANALYSIS 4) DESIGN APPROVAL WORK |
|
8 | GS E&C / PERTAMINA | RFCC SEMI MODULE MARINE TRANSPORT, LIFTING AND INSTALLATION ENGINEERING | 2012/10 ~ 2014/01 | 1) RX & RG STRUCTURE SEMI MODULE HANDLING 2) ASSEMBLY AREA LAY OUT ENGINEERING 3) SEA TRANSPORTATION ENGINEERING 4) LIFTING & ERECTION ENGINEERING 5) 3D CLASH CHECK |
|
9 | HYUNDAI E&C / HANGJIN DEVELOPMENT / CHANGWU MARINE | MACHANG BRIDGE TEMPORARY CONSTRUCTION WELL BARREL LIFTING AND INSTALLATION ENGINEERING | 2005/04 ~ 2005/05 | 1) REVIEW OF PC HOUSE SALVAGE PLAN 2) REVIEW OF LIFTING EQUIPMENT SPECIFICATIONS 3) DESIGN OF LUGS FOR LIFTING |
|
10 | DAELIM CONSTRUCTION | ABHAE BRIDGE CAISSON SALVAGE AND INSTALLATION WORK | 2001/10 ~ 2001/12 | 1) STRUCTURAL ANALYSIS OF SMALL SPHERES FOR LIFTING 2) REVIEW OF LIFTING STABILITY |
|